Posted by adminDecember 13, 2013Announcement News

Powering Up with Landfill Gas!

webnews_131213

On 6 Dec 13, the 2 new gas engines at Bukit Tagar Sanitary landfill finally got connected to the grid.

With the new additional power, more than 3 MW of green electricity (currently the largest biogas RE installation in Malaysia to knowledge) is currently been generated from the methane gas generated from the municipal solid waste generated from Kuala Lumpur.

This new achievement also allows around 40% (or around 1500 m3/hr) of the biogas captured been converted into energy while remaining are destroyed by flaring.

12 December2013

Comments are closed